For sale: a limited number of custom hand built replacement MTX power supply units.
Cost - currently £45.00 * (plus P&P) to forum members. Note: does not include the IEC mains lead, but does include a 1.8 metre output lead.
* [Or equivalent in your currency]
Built to order so dispatch will only occur after I have built it! Build time may exceed 28 days (as per Sinclair "standard").
There is one option - you can select the colour of the DC output on LED indicator. Specify when ordering. If the colour is not specified, a green LED will be fitted.
Either PM me, or post in this thread.
Mark
Limited edition custom hand built replacement MTX PSU
Limited edition custom hand built replacement MTX PSU


“There are four lights!”
Step up to red alert. Sir, are you absolutely sure? It does mean changing the bulb

Autumn is here. Bye bye summer 2024...
Not as many MTXs as Dave!

Re: Limited edition custom hand built replacement MTX PSU
Orders Received from:
#1 - 2015-07-16 - Claus (Crazyboss)
#2 - 2015-07-16 - Dave (Dave)
[This thread will be updated with order status]
Mark
#1 - 2015-07-16 - Claus (Crazyboss)
#2 - 2015-07-16 - Dave (Dave)
[This thread will be updated with order status]
Mark


“There are four lights!”
Step up to red alert. Sir, are you absolutely sure? It does mean changing the bulb

Autumn is here. Bye bye summer 2024...
Not as many MTXs as Dave!

Re: Limited edition custom hand built replacement MTX PSU
Update: parts have started to arrive 
Mark

Mark


“There are four lights!”
Step up to red alert. Sir, are you absolutely sure? It does mean changing the bulb

Autumn is here. Bye bye summer 2024...
Not as many MTXs as Dave!

Re: Limited edition custom hand built replacement MTX PSU
About time I posted a update...
At the moment I am currently testing one unit. Should be ready to ship next week.
The next unit is still being constructed, it should be ready sometime next week.
Finally, sorry about the delay. The usual story of real life getting in the way, and making use of the unusually dry and warm Autumn weather...
So Claus and Dave, who wants the first available unit?
Mark
At the moment I am currently testing one unit. Should be ready to ship next week.
The next unit is still being constructed, it should be ready sometime next week.
Finally, sorry about the delay. The usual story of real life getting in the way, and making use of the unusually dry and warm Autumn weather...
So Claus and Dave, who wants the first available unit?
Mark


“There are four lights!”
Step up to red alert. Sir, are you absolutely sure? It does mean changing the bulb

Autumn is here. Bye bye summer 2024...
Not as many MTXs as Dave!

Re: Limited edition custom hand built replacement MTX PSU
Hi Mark,
thanks for the update.
Claus was first on the list and I have a few PSUs, so I am happy to wait a while longer if required
regards
Dave
thanks for the update.
Claus was first on the list and I have a few PSUs, so I am happy to wait a while longer if required
regards
Dave